The Emirates Center For Strategic Studies and Research (ECSSR) was established on March 14, 1994, during the tenure of the late Sheikh Zayed bin Sultan Al Nahyan (may God rest his soul in peace), under a decree issued by H.H. Sheikh Khalifa bin Zayed Al Nahyan, President of the United Arab Emirates (may God protect him), who at that time was the Crown Prince of Abu Dhabi and Deputy Supreme Commander of the UAE Armed Forces. The establishment of the ECSSR was in line with the wise leadership of the UAE’s vision to consolidate the foundations of a modern state with institutions that offer valuable contributions to research and scholarly activities around the world. The ECSSR, under the guidance of H.H. Sheikh Mohamed bin Zayed Al Nahyan, Crown Prince of Abu Dhabi and Deputy Supreme Commander of the UAE Armed Forces (may God protect him), has become an independent institution focusing on scientific research in addition to political, economic, social and cultural studies pertinent to the UAE, the Arabian Gulf region and the world.

All the Audio-Visual systems are the state of art technologies to meet the current requirement, and business need of the customers.

The project scope was to refurbish the existing Media Monitoring Room

The scope was to de-commission the existing monitoring and recording system and to implement state of an art technology center in media monitoring and recording solution.

Thanks to the technologies we used, it consists of the following solutions,

  • Satellite TV infrastructure
  • Receivers
  • Controller
  • On live Network recorders.
  • Touch panels
  • Control monitors
  • 1.5mm pixel pitch curved LED screen for multi window display
  • Matrix switchers
  • Video wall processors
  • Audio reinforcement system

The challenge was to have detailed finished display installation, as we are responsible for the LED support and paneling to match to the interior aesthetic of the room.

Technical challenge was the integration of control system and on line recording solution with the user interface touch panel, as the user should be able to retrieve the live recorded files and replay, in an operator friendly manner.

At the end we are so happy that we delivered a good project.

Type of works done

Monitoring and Control

Control and Monitoring

Room Type

3.5 million AED

Contract Value

2019

Completion Year

Project Manager

Shine Joseph